The 5-Second Trick For Cast in Situ Piles in Dhaka
As found in the figure below, continual auger is utilized to drill the borehole, lift up drilled soil, and pour concrete when the auger is moved up. Because of this, the borehole will not have to have casing or hydrostatic stress to avoid damage to the borehole wall.
?????? ?????????? ???? ??????